Desand Tank Farm Area
Location: Cenovus Christina Lake Project Phase 1C
Project Summary: The work included:
1. The installation of all electrical and instrument materials to complete new construction of
the following areas:
Slop Treating Area
Desand Tank Farm Area
Desand Building
Inlet Degasser Area
New Electrical MCC Building
2. The completion of the electrical installation of the new control room area including the high
voltage / MCC sections and all PLC / Marshalling communications .
3. Completion of several smaller construction projects in the existing running plant including
expansion of boiler feedwater building , new iron filter package and new WAC/SAC units.
4. Provided a comprehensive and detailed QA/QC package for all work performed including all
electrical and instrument testing reports
Gallery Desand Tank Farm Area